Home Additions & ADUs Austin, Texas

Primary suites, second stories, and detached units, with the site questions answered and the price fixed before construction begins.

5.0based on 26 reviews
63Austin Projects
1 in 2Clients From Referrals
3%Surprise Change Orders
2–4Weeks to Full Design
Site Answers First

Site answers, before design

After the walkthrough, we map what your lot allows: setbacks, trees, utilities, and structure, in writing, before design begins.

Setbacks and coverage

How far and how much, mapped against zoning and your survey.

Trees and easements

Heritage trees and utility easements, located before we draw.

Structure and utilities

Foundation type, panel, and sewer, engineered from the start.

Budget, before design

A realistic range before renderings begin. Most Austin additions land between $120K and $500K+.

Aerial site plan of an Austin lot with the addition, setback line, protected heritage oak and utility easement marked
Before and After

The same house, transformed

A dormer addition, before and after. We build up from the original structure instead of tearing down, and the new roofline is designed into the old one.

The house before the addition: single-storey stone cottage under live oaksBefore
The same house after the addition: a white board-and-batten dormer storey built over the original stone wallsAfter
The original houseDormer addition added
Keep scrolling

Rooflines that resolve

Pitches and eaves continue the original geometry. The roof is designed first, because it is the tell.

Transitions you walk through

Floor heights align and sightlines carry, so the new wing feels inevitable, not negotiated.

Materials matched to the era

Brick, siding profiles, and window proportions sourced to match the original.

Detached ADUs

A second home, on the lot you own

Austin's ADU rules are the most generous they have ever been. A detached unit is a real small house, designed with the same renderings-first process as the main one.

BuiltGround-up, foundation to roof
InsideKitchen, full bath, laundry
Air and materialsSealed envelope, low-VOC throughout
On paperIts own address, permitted to rent
Detached ADU site planTree & Environmental · Permit Set
City of Austin permit sheet for a detached ADU: site plan with tree-protection details and impervious cover tables

Converting an existing garage instead of building new? That is its own project.

See Garage Conversions
How We Build

Built new, from foundation to roof

An addition is new construction. Every layer goes in to today's standard, because we put it there.

Two asphalt shingle roof planes meeting at a valley lined with metal flashing, in low evening sun

The roof

Geometry that resolves into the original house.

Pitch matched, valleys flashed in metal, shingles color-matched across both roofs.

New exterior wall in house wrap with taped seams and a framed window opening, grey mineral wool insulation in the reveal

The envelope

Sealed, insulated, and low-VOC from day one.

Sheathing, house wrap, and sealed penetrations, then insulation to current code.

New pale stud framing and a beam meeting an older dark weathered timber post and header at the tie-in

The frame

New structure, tied to the house at one seam.

A new load path to its own footings. The original house carries nothing new.

Freshly poured concrete slab with rebar dowels set along the wood form board, beside an older concrete wall

The foundation

Engineered for the addition, not borrowed from the house.

Piers or slab, sized from soil conditions on your lot, not assumptions.

During Construction

How long an addition really takes

Construction typically runs 10 to 14 weeks. Every phase and payment milestone is sequenced before demo, and you follow it live in your client portal.

portal.ensohomes.com/schedule
Construction Schedule · 13 weeks
work phase4next payment milestone
Design complete40%
Permit filed
Construction start
Rough-in complete25%
Substantial completion25%
Your sign-offfinal 10%
W1W3W5W7W9W11W13
3456
Site prep + foundation
Framing + roof
Windows + dry-in
MEP rough-in
Tie-in to the house
Insulation + drywall
Interior finish
Punch list + your sign-off

All of this is the Enso Standard, six practices built into every project.

See the full process
Investment

Real numbersbefore we meet

Most Enso projects combine more than one space and land between $75K and $500K.

Detached ADU$120K–$250K
Primary Suite AdditionMost Common$150K–$300K
Second Story or Multi-Room$300K–$500K+

Ranges reflect completed Austin projects. Yours may vary with scope, materials, and site conditions.

The Enso Guarantee ℠
If design missed it, the cost is ours.

The design phase exists to find problems before demo begins. If something slips past us, we make it right at our expense.

How the guarantee works
Common Questions

Additions and ADUs, answered

Do I need a permit for a home addition in Austin?
Always. Additions change the building footprint or structure, which triggers City of Austin building permits and review against setbacks, impervious cover, and the heritage tree ordinance. We scope all of it in the site study and handle the permit package, so approvals are moving while design finishes rather than after.
Should we add on or move?
Run both as numbers, not feelings. An addition prices out in design, and the comparison is that fixed price plus the disruption of a build against realtor fees, moving costs, and current interest rates on a new mortgage. Many Austin families find keeping a low mortgage rate and adding the suite wins. When it does not, we say so at the planning call.
What is the difference between an addition and an ADU?
An addition extends your house: same walls, same systems, more rooms. An ADU is a separate dwelling with its own kitchen, bath, and entry, either detached in the yard or converted from existing structure. Additions add space you live in, ADUs add space that can earn. We build both, and the site study prices the comparison.
How long does an addition take?
Design and permitting run 6–10 weeks, much of it city review time. Construction typically runs 10–14 weeks depending on scope, with a detached ADU at the shorter end and a second story at the longer. You get the dated schedule before ground breaks, and daily photo logs against it in your client portal.
Can our foundation and structure handle a second story?
That is a structural engineering question, and it is answered in the site study, not assumed. Pier-and-beam houses often carry a second story with reinforcement, slab foundations depend on the original pour. If the answer is no, you learn it in design for the cost of the study, and usually a ground-level plan gets you the same square footage.
Will the addition match our house?
That is the design brief. Rooflines resolve into the original geometry, floor heights align, and siding, brick, and window proportions are sourced to match the era. The renderings show the whole exterior, so you approve how it meets the original before anything is framed.
Do we have to move out during the build?
Almost never. The build lives outside your walls behind a sealed exterior wall for months, then ties in during one scheduled week with containment and HEPA filtration inside. You know that week’s dates before signing, and outside of it your kitchen, baths, and routines run untouched.
What happens if something unexpected turns up?
You get choices with line-item costs, not an ultimatum. The site study, 3D scan, and engineering happen before pricing, which is why surprise change orders are rare on Enso projects. And if design should have caught it, the Enso Guarantee applies – the cost of fixing it is ours.
When You're Ready

A conversation about your project, timeline, and budget. You'll leave with real next steps, whether or not we build together.